Skip to content
CLOSEOUT
Home
CLOSEOUT
CLOSEOUT
n3otato
2020-04-20T13:41:24-04:00
closeout
Technicians close out form.
Time In:
*
:
Hours
Minutes
AM
PM
AM/PM
Time Out:
*
:
Hours
Minutes
AM
PM
AM/PM
Work Completed:
*
Select All
Traced and tested existing cabling.
Network mapping.
Wiring/ ran new cable (homeruns).
Rebuilt existing network.
Created a separate network.
Re-terminated jacks/plugs as needed.
Removed old equipment.
Installed new equipment.
Troubleshooted equipment in question.
Printed a test ticket in each printer installed/serviced.
Tested card processing.
Tested cash drawers.
Labeled, cable managed and cleaned up.
Called and worked with the support team.
Wall mounted devices.
Troubleshooted Caller ID.
Installed KDSs.
Other.
Please select all that apply.
Notes (Other):
Materials:
Cat5e plenum cable.
Cat6 plenum cable.
5-port switch.
8-port switch.
KDS mount.
KDS pole mount hardware.
Power splitter/ surge protector.
PoE injector.
Ethernet jack.
Rj45 modular plugs.
Biscuit jacket (2-port).
Low-voltage faceplate/wall plate.
Low-voltage in-wall plate bracket.
Industrial velcro.
Zip-ties.
Labels.
Staples.
Patch panel.
Other.
Cable quantity (ft)
*
Network Map
*
Max. file size: 128 MB.
*Required: please sketch or upload a diagram clearly identifying runs and devices.
Documentation and photos
*
Drop files here or
Select files
Max. file size: 128 MB.
*** Please note that photos are required to get paid.
Signature
Page load link
Go to Top